Solar quotes for UK homes

Solar panel installers: check them first, then get a quote

Almost every solar installer says the same things on its website. What separates them is on paper: the certification they hold, the consumer code they follow, and what their written quote and contract actually commit them to. This site shows you where to check each one and what a good installer has to do for you, and you can ask us for a quote for your own home.

Get a solar quote Compare your quotes

  • MCS for the technology
  • RECC or HIES consumer code
  • Three written quotes
  • No pressure to sign

What an MCS certified installer must do

  1. Be trustworthyGive you the Customer Commitment before you agree anything, and follow MCS standards.
  2. Be responsibleNo pressure to sign, no misleading headline prices, and defects put right.
  3. Communicate wellName any subcontractors, and explain permissions, approvals and notifications.
  4. Contract with clarityA detailed written quote, product details, a protected deposit, cancellation rights.
  5. Hand over properlyA demonstration, a handover pack, and key documents within 30 days.
  6. Handle complaints wellAcknowledge within two working days, then MCS and independent resolution.

From the MCS Customer Commitment, version 1.1, September 2026

Near you

Finding solar panel installers near you

In short: start from the registers, not from adverts. The MCS installer search lets you look up certified installers by postcode and technology, so choose solar PV, and battery storage as well if you want a battery. Then check that the firm belongs to a consumer code approved by the Chartered Trading Standards Institute, such as RECC or HIES, using their own member searches. A firm on both has signed up to standards for how it sells, quotes, installs and handles complaints.

Distance matters less than people think. What matters is whether a firm can survey your home properly, answer your questions in writing, and come back if something needs putting right. A local installer can make aftercare easier, but a firm a little further away that does all of that is a better choice than a nearby one that won't.

Our guide to finding installers walks through each register, what it shows and what it doesn't. For what MCS, RECC and HIES each mean, see MCS, RECC and HIES explained.

Who checks what: MCS shows whether an installer is certified for a technology; RECC or HIES shows a consumer code approved by the Chartered Trading Standards Institute; a competent person scheme lets a firm self-certify building regulations work; TrustMark's Find a Business shows registration; the FCA register shows whether a firm can arrange finance.
Each register answers a different question. Our illustration. View larger

Compare your quotes

Put your quotes side by side

Enter the size and price from up to three written quotes, tick what each one shows, and see them compared per kWp with any missing items listed. It runs in your browser from your own figures: nothing is sent, and nothing is ranked.

  1. Prices and sizes
  2. What each includes
  3. Your comparison

1. Prices and sizes from your quotes

Copy the system size in kWp and the total price including VAT from each written quote. Two quotes are enough; leave the third blank if you don't have one.

Quote A

Quote B

Quote C

2. What each quote includes

Tick each item the quote or its contract papers actually show. These come from the contract and handover items in the MCS Customer Commitment and RECC's consumer tips.

ItemABC
Says you will get an MCS certificateMCS: your contract should reference the MCS certificate
Make, model and power rating of each productMCS: product details must be stated in the contract
A written performance estimate, with its assumptionsMCS and RECC: realistic estimates in writing before you sign
Deposit amount, and how it is protectedMCS: a deposit must be reasonable, scheduled and protected
Estimated delivery and installation datesMCS: dates must be given
Your cancellation rights explainedMCS: cancellation rights, including deposit refunds
Scaffolding and any extra work pricedMCS: additional work and its cost at quotation stage
Who tells the network operator (G98 or G99)MCS: proof of notification within 30 days of completion
Who notifies building regulationsMCS: what must be notified, and by whom
Workmanship warranty and its financial protectionRECC: at least two years, with protection if the installer stops trading
3. Your comparison

Enter the price and size from at least two quotes, then tick what each includes, to see them side by side here.

Worked out in your browser from your own figures. Nothing you type is sent anywhere, and no installer is ranked.

What good looks like

What an MCS certified installer has to do for you

The current MCS Customer Commitment, issued in September 2026, says every MCS certified installer must follow it and give you a copy before you commit to anything. It is the clearest single statement of what a solar customer is entitled to expect, and it is worth reading before the first sales conversation.

It covers six areas. The installer must be trustworthy, following MCS standards for the technologies it is certified for. It must be responsible: no pressure to sign, no misleading headline prices, defects put right within a reasonable time, and records kept for at least six years. It must communicate well, naming any subcontractors and explaining which permissions, approvals and notifications the job needs and who handles them.

It must contract with clarity: a detailed written quote, product details in the contract, a reasonable deposit that is protected, realistic performance estimates, and your cancellation rights explained. It must hand over properly, demonstrating the system and giving you the MCS certificate, any building regulations certificate and proof of network notification within 30 days. And it must handle complaints well, acknowledging them within two working days and taking part in independent dispute resolution if needed.

A written solar quote should show: who the installer is and any subcontractors; make, model and power rating of each product; full price, extras and VAT; a written performance estimate with assumptions; deposit, payment stages, protection and cancellation rights; dates, permissions, notifications and the MCS certificate.
What a written quote should show. Our checklist from the MCS Customer Commitment and RECC. View larger

The checks, side by side

What each register tells you, and where to look

Search each register yourself, on its own website
CheckWhat it tells youWhat it doesn'tWhere
MCSThe firm is certified for named technologies, such as solar PV and battery storageThat every job it does is good, or that it is certified for a technology not listedMCS installer search
RECC or HIESThe firm follows a consumer code approved by Trading Standards, with dispute resolutionThe quality of a particular quoteThe code's member search
Competent person schemeThe firm can self-certify work such as electrics under building regulationsAnything about solar designThe scheme's own register
TrustMarkThe firm is registered, and for which tradesAnything from a logo aloneTrustMark's Find a Business
FCA registerThe firm can arrange credit, and on what basisWhether the finance suits youFCA register
Eight steps of a home solar job: find certified installers; survey of roof, wiring and shading; written quote and estimate; contract and cancellation rights; network application if G99; installation with scaffold, panels, inverter and testing; handover demonstration and pack; documents within 30 days, including the MCS certificate.
A typical job from first contact to certificate. Our illustration. View larger

The job

What happens between first contact and the certificate

A well-run solar job has a predictable shape. A survey of the roof, the wiring and any shading comes first, because no honest quote can be written without it. A written quote and performance estimate follow. Once you sign, a cancellation period may apply, and if the system is large enough to need a G99 application, the installer applies to the network operator before work starts.

The installation itself usually takes a day or two once scaffolding is up. Then comes the part people forget: a handover, where the installer shows you how the system works and leaves a pack with the key parts, the maintenance schedule and the warranties. Within 30 days you should have the MCS certificate and the other paperwork.

See the process step by step, what the survey should cover, what gets installed, the kit list explained, planning and building regulations and how long it takes.

The cheapest quote

Judge the system you get, not the headline price

A solar installation is paid for once and then works for many years, so the useful comparison is what each quote buys over that time. Two quotes for the same kWp can differ in panels, inverter, mounting, scaffolding, warranties and aftercare. The lower price is only the better deal if it includes the same things.

That is also why the performance estimate matters. MCS installers must give you realistic estimates of how the system is likely to perform before you sign, and RECC members follow set rules for calculating them. Ask to see the assumptions: your electricity use, how much you're likely to use yourself, and what export payments under the SEG might add.

MCS also says not to sign on the strength of a particular energy price, because tariffs change. A quote whose case only works at one tariff is a weak quote. See reading a performance estimate and comparing quotes.

Walk away if

Sales tactics that should end the conversation

  • A discount that only applies if you sign today. RECC tells consumers not to accept one.
  • A quote given without anyone looking at your roof or your fuse board.
  • A "government grant" that can't be named or found on GOV.UK.
  • Finance pushed before you've seen the full price, or from a firm you can't find on the FCA register.
  • Claims of certification you can't find on the register itself.
  • Texts or calls "from MCS" saying your solar warranty has expired. MCS has warned these are scams.

More in red flags when choosing an installer.

If it goes wrong

Protection after you sign

RECC members must provide a workmanship warranty of at least two years, covering problems caused by incorrect installation, with financial protection if the installer fails to put an issue right or stops trading. They also give you access to a dispute resolution service, independent of both sides, at no cost to you.

For any MCS installation, the route is the same: raise the problem with the installer first, then escalate to MCS, which acts as a single point of contact for complaints about certified installers and involves the right organisations. If the complaint still can't be resolved, independent dispute resolution follows.

See when something goes wrong, contracts and deposits and maintenance and aftercare.

Quick answers

Solar panel installer questions

How do I find a solar panel installer near me?

Search the MCS installer register by postcode and choose solar PV as the technology. Then check the firm on the RECC or HIES member search for its consumer code. Both registers are free to search and run by the schemes themselves.

Does a solar panel installer need to be MCS certified?

Not by law, but you need an MCS certified (or equivalent) installation and installer to receive export payments for a system up to 50kW, and MCS certification is how most buyers check competence. Make sure the certification covers solar PV, and battery storage too if a battery is included.

How many quotes should I get?

RECC recommends at least three, from three different installers. Compare what each includes, not only the price, and be cautious of any quote that is much higher or lower than the others.

Can I cancel a solar contract after signing?

If you signed at home or online, you normally have 14 days to cancel under the Consumer Contracts Regulations. An MCS installer must explain your cancellation rights, including when a deposit is refunded.

What if something goes wrong after installation?

Complain to the installer first; MCS suggests 14 days is a reasonable maximum for a response. If it isn’t resolved, MCS acts as a single point of contact for complaints about certified installers, and a dispute resolution route that is independent of both sides.

Can I ask for a solar panel quote here?

Yes. Use the form on any page: give your postcode, say a little about the house and the roof, and tell us whether you want panels, a battery or both. It goes to SEO-DONS LTD, which runs this site, and we reply by email.

Sources for this page

Ready for a solar panel quote?

Tell us about the house and the roof, and what you would like priced: panels, a battery or both. If an installer has already quoted, add the system size and the price. Your details reach SEO-DONS LTD, which runs Solar Panel Installers, and we reply by email.

What happens next

  1. Your details go to SEO-DONS LTD, the company that runs Solar Panel Installers.
  2. We read what you have told us about the house and reply by email.
  3. Asking for a quote costs nothing and puts you under no obligation.
Add more about the house, or a quote you hold (optional)

Published by SEO Dons Ltd. We don't install panels ourselves. We reply by email. See our privacy notice.

Get a solar quote
Get a solar quote